Construction · Under construction
Hillside Residence Build
Trasacco Valley, Accra
Ground-up construction showcasing precise structural work and disciplined site management, from formwork and reinforcement to blockwork.
The challenge
A sloping site that required careful setting out, robust foundations and strict quality control on every concrete pour.
Our solution
We stepped the foundations to follow the terrain, inspected reinforcement before each pour and sequenced trades to keep the programme moving through the rainy season.
Outcomes
- Stage inspections at every critical pour
- Weekly photo reports to the client
- Programme maintained through the rains